TitleProduct

250kg/hr Oil Sludge Incinerator With Gas Disposal

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Tianjin

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-04 21:52

  • Browse the number:

    151

Send an inquiries

Company Profile

Holy City Limited

By certification [File Integrity]

Contact: shengcheng(Mr.)  

Email:

Telephone:

Phone:

Area: Tianjin

Address: Tianjin

Website: http://www.holycitylins.com/ http://shengcheng.chinajiejia.com/

Product details



Brief Introduction

The solid incinerator can burn middle quantity solid or liquid industrial incinerator including oil sludge and other oil waste. It is with full set of gas disposal system.


Technical Data

NO.

NAME

LIST

QTY

1


Primary burning system



One set



Material and thickness: A3 steel 6mm + 200 ~ 250 mm acid-resisting and alkali-resisting refractories

(High temperature resistant: 1790℃)




Furnace body, furnace interior volume: 4.0 m3,

fire bed area :0.95 m2




Temperature test mouth, feeding door, ash door, ash hook




Ignition burner: G20 diesel oil, fuel line control system, oil tank (0.3 m3)




air blower (5.5 KW), valves and piping


2

Secondary burning system



One set



material and thickness: A3 steel 6 mm +refractory material 200 mm




Secondary chamber




Explosion -proof door, hinge, etc




Secondary burner:G20 diesel oil,fuel line control system




Operating platform, ladder


3


Dust collector



One set



material and thickness: A3 steel 6 mm +refractory material 200 mm




Dust collector body, processing capacity : 5000 m3 / h


4

Secondary spray tower



One set




Material: A3 steel lining anti-corrosion coating + stainless steel nozzle + packing




Washing tower body,

smoke processing capacity :5000 m3 / h




Circulating pump 4.0 KW, 316L stainless steel spiral nozzle, ceramic pall ring filler




Stainless steel spray pipe and control valves


5

Flue exhaust system


One set



High temperature flue: A3 steel 6 mm + thermal insulation material




Low temperature flue: 6 mm + A3 steel anti-corrosion paint





Exhaust fan:7.5 KW, 5430 m3 / h, 2880 pa, induced air adjustment valve


6


Chimney



One set



Exports: Φ 426, 15 meters high from the ground




Material: steel A3 + anticorrosive coatings


7


attachment system



One set



other standard parts, platform, support, safe passage and guardrail, repair tools, etc


8

Electronic instrument control system



One set



Zhengtai (or at the same level product)electrical accessories, outdoor waterproof type electric control cabinet, instrument, meter, temperature display, wire and cable and thermocouple




Liquid level alarm system, high and low temperature load and leakage protection interlock system


9

Protective coating



One set



Two layers of high temperature resistant paint


Attach: operating costs

1.Gross capacity: 18 kw

air blower:5.5 Kw * 1 (operation continuous) 	

exhaust fan:7.5 Kw * 1 (operation continuous)

primary burner:0.32 Kw * 1 (operation intermittent)

Secondary burner:0.32 Kw * 1 (operation continuous)

Lye pump:4.0 Kw * 1 (operation continuous)

2.fuel consumption:5-20 kg/h (according to the waste heat value and change, the higher heating value, the less fuel consumption, lower heating value, the greater fuel consumption).

3.lye consumption:(including acidic gas meter at 0.1%) sodium carbonate consumption is about 14.5 kg per tonne of waste

4.operators:1 person/class

5.the equipment covers:8 m x 10 m


 


★ Commissioning & Installation